Worklogs Report

Log Time

This article explains why and how to enter a worklog from within the report.

Why should you log time from within a report?

The report helps you visualize the impact of logging time for an issue on its original estimate, cumulative time spent, time spent beyond the estimate, and remaining time, without leaving the report.

How can you enter a worklog?

To add a worklog to an issue, follow these steps:

  1. In the Header section, click Log Work.

Group 29 (4)-20260707-012254.png
  1. In the Log Work pop-up, enter the logged time in the Time Spent field.

  2. (Optional) Update the Remaining estimate and work start date and time, and add a comment.

Group 29 (3)-20260707-011810.png

FAQ

What is the difference between Time Spent and Time Logged?

Time Spent represents how much of the original estimate has been consumed. It is mainly used as a progress indicator to show how much work has been completed relative to what was planned.

Time Logged represents the actual work recorded by users during a specific period. You obtain Time Logged by filtering Time Spent using the Date Range in the Sources section.

For example, if you want to see how much time was logged during the last sprint, you can set an interval that matches the sprint’s start and end dates. The filtered result shows the time logged only within that period.


If you have questions or need assistance, contact our support team via email or service desk. Our team is available Monday through Friday (9:00 AM to 7:00 PM GMT+7) to help with technical challenges or discuss improvements.